Heating/Hot Water

Third day without heating and hot water (3 Days)

After the fire in the boiler room the Camden Council has not yet managed to repair the central heating and the hot water supply for the Curnock Estate. It is now the third day without any updates or progress.

The fire has also damaged the lights that are located behind the Goldthorpe building and as a consenquence the whole area between Goldthorpe and the Marr is dark and dangerous.

Category: 

Loss of Heating and Hot Water

The Repairs Service Contact Centre informed us today about the heating and hot water problem. You can either read the letter below or you can download the original letter by clicking here.

Date: 18 February 2009

All Residents
Curnock Street Estate
Camden NW1

Dear Residents

Re: Emergency: Loss off Heating and Hot Water.

Category: 

Fire inside the boiler room

This evening there was a fire inside the boiler room. The firemen told us that there was a problem with the industrial fuses which were inside a wooden fuse box. That wooden fuse box caught fire which led to a temporally power failure for most of the Curnock Estate flats.

The power failure lasted for 5 minutes. Unfortunately the hot water and the central heating were affected from that incident. More information soon.

Category: 

Major Works about the Proposed Heating Works

VENUE: 11-17 The Marr, Camden Street, NW1 0HE

You are invited to drop in session to find out more about the proposed heating works to your estate. A drop in session will be held in the day and one in the evening.

At the drop in sessions you will be able to discuss Camden Council's proposals with their consultant Chris Palmer from Nifes Consulting Group and Jackie Louis from Camden Council. The Councillorshave also been invited to the drop in sessions and so have representatives from the District Housing Office.

Category: 

Shutdown of Hot Water an Heating REF: 337191

Please be advised that due to essential repair works being carried out to a stop valve in your block, the hot water system to your homes will have to be shutdown. As a result there will be no heating and hot water from 9am to 1pm on Monday 19th May 2008.

The work will be carried out by council's contactor Seaflame. They will be on site at all times during the shutdown.

Category: 

Shutdown of Central Heating Supply For Repair

The following letter was sent to some residents of the Curnock Estate regarding the Shutdown of central heating supply to block alowing for an essential repair.

The sutdown will affect the following residents:

1-66 Mexborough
1-18 Billingley
1-34 Goldthorpe
1-18 Ravenscar

"Dear Residents,

Category: 

Pages

Subscribe to RSS - Heating/Hot Water